Temporary Construction Services

Construction planning guide

Utility-Served Temporary Power vs. Generator Support

Compare utility timing, operating needs, site access, and project duration before choosing a power approach.

01

Utility-served temporary power

A prepared temporary system can support ongoing construction after the serving utility completes the live connection. It depends on the parcel, utility process, site readiness, applicable jurisdiction steps, and utility scheduling.

02

Generator support

A generator may support work where utility power is not yet available, where the project is short-term, or where the operating plan calls for another approach. Loads, run periods, placement, access, sound, and fueling all need review.

03

Compare the operating plan

Consider what needs power, when it runs, how long support is expected, whether the work moves, and how regularly the site can be accessed. Cost and suitability require project-specific review rather than an automated rule.

04

Transitions and combined plans

Some projects may need generator support while utility-served temporary power is being prepared. If both are being considered, share the anticipated transition point and any schedule dependencies.

05

Keep the connection boundary clear

TCS builds and prepares the temporary power system. The serving electric utility makes the final connection to live power. Generator service is coordinated separately around the confirmed project scope.